Four scrubbers for cruise liner

Print Friendly, PDF & Email

Green Tech Marine has signed a contract to deliver four scrubbers to[ds_preview] the Norwegian Cruise Line’s vessel »Pride of America«, built in 2005. The scrubbers will be installed during dry docking at Pearl Harbor Naval shipyard. Scrubbers will replace the ship‘s silencers and clean the exhaust of four 8 MW engines, in total 32 MW. The system will be a hybrid system, i.e. the vessel will be able to operate both in open loop as well as in closed loop. Thanks to the small size of the scrubbers, no valuable space for passengers or crew has to be sacrificed.